Fitness Hub Gym
Client
Fitness Hub
Date
January 2024
Location
Faridabad, Haryana
Project Overview
For this high-intensity gym environment, we installed an 11 TR Daikin Duct AC system with an oval duct layout. The objective was to ensure even airflow, minimal noise, and optimal cooling during peak workout hours, all without disrupting the gym’s aesthetic design.
- High-capacity duct AC
- Aesthetic oval ductwork
- Zoned, consistent airflow
Project preparation
Careful airflow simulation and duct path planning around gym equipment zones.
Fix the problem
Delivered high-performance cooling and ventilation with modern, space-saving oval ductwork.
Make Appointment
Start Your Project with Confidence
Work with the HVAC partner that understands engineering, design timelines, and long-term ROI.
- From site audit to post-installation service
- Save on energy bills, not on comfort
- HVAC-certified professionals





